Categories

Contact Us

Weifang Best Power Equipmengt Co.,Ltd

Address:Economic Development Zone, Weifang, Shandong, China

Contact:Jacky cai

Tel:86-536-3025266

M/P:86-13475688699

Fax:86-536-3025266

Email:jacky@wfbestpower.com

Diesel Generator Set maintenance table and maintenance standard

- Apr 24, 2017 -

Daily Maintenance (work per class);
Primary technical maintenance (cumulative work 100 hours or every 1 months);
Secondary technical maintenance (cumulative work 500 hours or every 6 months);
3-level technical maintenance (cumulative work 1000-1500 hours or every 1 years).
If any maintenance is carried out, there should be planned, step-by-step demolition and installation, and reasonable use of tools, force to be appropriate, after disintegration of the parts of the surface should be kept clean, and coated with anti-rust oil or grease to prevent rust; note the relative position of detachable parts, the structural characteristics of non-detachable parts, and the assembly clearance and adjusting methods. At the same time, the diesel engine and accessory should be kept clean and complete.
Daily Maintenance
Ordinal
Maintenance Project
1 check fuel tank oil quantity
2 Check the oil plane in the sump of bottom
3 Check oil plane of fuel injection pump Governor
4 Check three leaks (water, oil, gas) condition
5 Check the installation of diesel engine accessories
6 Check the meter
7 Check the fuel injection pump drive connection disc
8 clean diesel engine and accessory equipment exterior

Related Products